In this project, Max Fowler, Arun, and Manoj successfully addressed and resolved Open MPPT (Maximum Power Point Tracking) related issues. The team encountered a problem with the Open MPPT coil, which had become unsoldered, potentially due to excessive heat. With their expertise and skills, they meticulously soldered the coil back into place. However, during the process, there was some uncertainty about whether the Open MPPT system was functioning correctly again. The team took the necessary measures to verify its functionality before confidently reinstalling it on the bamboo tower. Thanks to their diligent efforts, the Open MPPT system was restored to its optimal working condition, ensuring efficient power point tracking for the project.

Auteur

Collectif Janastu

Année de publication

2023

Pays / région concerné(e)

Sud mondial

Complexité

Des connaissances préalables, mais non spécialisées, sont nécessaires à sa compréhension.

Mot-clé

Type de réseau

Réseau communautaire

Type de licence

​CC-BY-SA-4.0

Type d'article

Vidéo

Langue

Anglais

Sujet spécifique - Social

N/A

Sujet spécifique - Technique

Matériel, outils et infrastructure

Sujet spécifique - Economie

N/A

Sujet spécifique - Réglementation

N/A

Perspective de genre

Non

Accessible aux personnes souffrant de déficiences visuelles ou auditives

Non

Continuez à chercher !

Utilisez les filtres inclus dans l'outil de recherche pour obtenir un résultat plus précis.